No Result
View All Result
  • Тоҷикӣ
  • Русский
ENGLISH BANNER
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
Rogun HPP
No Result
View All Result

REQUEST FOR EXPRESSIONS OF INTEREST Republic of Tajikistan Technical Assistance for Financing Framework for Rogun Hydropower Project  Project ID: P178819 Consulting services: Environmental Specialist (RHPP/CS/IC/8/L) Project Background

admintj by admintj
12.03.2025
in News, Tenders
0
0
SHARES
9
VIEWS
Share on FacebookShare on Twitter

REQUEST FOR EXPRESSIONS OF INTEREST

Republic of Tajikistan Technical Assistance for Financing Framework for Rogun Hydropower Project  Project ID: P178819 Consulting services: Environmental Specialist  (RHPP/CS/IC/8/L) Project Background

The Government of the Republic of Tajikistan has received financing from the World Bank in the amount of US$15,000,000 toward the cost of the Technical Assistance (TA) for Financing Framework for the Rogun Hydropower Project and intends to apply part of the proceeds for the proposed consulting services.  This project is jointly financed by the Asian Infrastructure Investment Bank (AIIB) (US$ 5.0 million).

The TA Project will help to: (a) strengthen technical, environmental, and social aspects of the Rogun hydropower plant construction project (Rogun HPP Project); (b) develop the commercial framework of the Rogun HPP Project; and (c) strengthen the institutional capacity of the Project Management Group for Energy Facilities Construction under the President of the Republic of Tajikistan Rogun (Rogun PMG), which is the implementing entity for Rogun HPP Project.

Main objectives of the assignment

 The main task to be carried out by Environmental Specialist is: supervision and monitoring of project works in accordance with the ESMP and reporting on the environmental aspects of the project. The Consultant will closely work with the Senior E&S Specialist and other members of the Project Management Group for Energy Facilities Construction under the President of the Republic of Tajikistan (hereinafter referred to as Rogun PMG), SE Directorate for Flooding Zone (DFZ) and OJSC Rogun HPP and project participants, for attainment of the objectives, etc.

The Terms of Reference for the assignment can be found at the following link:

https://drive.google.com/file/d/1MCaaEXLvc4UErDuRhRff5JJRsJrbVu0U/view?usp=sharing

Qualification requirements:

  • University degree (higher education) in environmental engineering, or environmental sciences, or social sciences, or other relevant technical field. Specialization in environmental and/or social safeguards or occupational health and safety would be an advantage;
  • At least five (5) years of experience in preparing and leading the preparation of E&S documents for large infrastructure projects, including dams and hydropower that meet the requirements of the World Bank (either the World Bank Safeguard Policies or the new Environmental and Social Framework (ESF)) and/or other International Financial Institutions, and best international industry practice;
  • At least five (5) years of experience in the preparation and implementation of environmental management and mitigation plans for mid-size and large hydropower projects, including work related to biodiversity conservation and dam safety;
  • Good knowledge of environmental legislation of the Republic of Tajikistan;
  • Extensive knowledge and experience in the implementation of the World Bank E&S Framework (ESF), the General Environmental, Health and Safety Guidelines (EHSG) of the World Bank Group and/or the environmental and social policies of other International Financial Institutions, as well as good international industry practices;
  • Successful experience of working in teams of specialists, including the integration of findings and the development of practical recommendations;
  • Fluency in verbal and written English, Russian, and Tajik languages;

An individual Consultant shall be selected following Open Competitive Selection of Individual Consultants in accordance with Section VI, paragraphs, 7.36 and 7.37 of “Procurement Regulations for IPF Borrowers” September 2023 (“Procurement Regulations”)

The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” September 2023 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest.

Interested consultants may obtain further information at the address below during office hours 09:00 to 17:00 (local time).

Interested specialists must submit CV, two Recommendation letters and a cover letter in Tajik/Russian and English languages with indication of the position name to the address below (in person or by e-mail) by March 19, 2025 (17:00 Dushanbe time)

Attn: Mr. Pulod Muhiddiniyon

Director

Projects Management Group for Energy Facilities Construction

under the President of the Republic of Tajikistan

5/1 Shamsi str., 6 th floor, 734064, Dushanbe
Tel.:(+992 37) 235 74 17
E-mail: grpsgs@gmail.com  

Previous Post

REQUEST FOR EXPRESSIONS OF INTEREST Republic of Tajikistan Technical Assistance for Financing Framework for Rogun Hydropower Project Project ID: P178819 Consulting services:Disbursement Specialist (RHPP/CS/IC/7/L)

Next Post

REQUEST FOR EXPRESSIONS OF INTEREST Republic of Tajikistan Technical Assistance for Financing Framework for Rogun Hydropower Project Project ID: P178819 Consulting services:Gender Specialist (RHPP/CS/IC/10_/L)

admintj

admintj

Next Post

REQUEST FOR EXPRESSIONS OF INTEREST Republic of Tajikistan Technical Assistance for Financing Framework for Rogun Hydropower Project Project ID: P178819 Consulting services:Gender Specialist (RHPP/CS/IC/10_/L)

Information of Rogun HPP

The Rogun HPP (Taj. Nerugohi barqii obii Rogun) is a hydroelectric power station under construction in Tajikistan on the Vakhsh River, which is part of the Vakhsh cascade, being its upper stage. Upon completion of the project, the dam of the Rogun HPP with a height of 335 m will become the highest in the world, and the plant will reach a capacity of 3600 MW and become the largest hydroelectric power plant in Central Asia.

Contacts

Address: 40 Sohtmonchieon str. Rogun
735417, Republic of Tajikistan
Phone: (992 3134) 22436, (992 3134) 21517;
Fax: (992 3134) 22435
E-mail: info@rogunges.tj

Contacts for international

+992 37 2410405

Social networks

  • 2023 OJC “Rogun Hydropower Plant” All rights reserved

© 2024 ҶСК "НБО Роғун"

No Result
View All Result
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
  • English
    • Тоҷикӣ
    • Русский

© 2024 ҶСК "НБО Роғун"