No Result
View All Result
  • Тоҷикӣ
  • Русский
ENGLISH BANNER
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
Rogun HPP
No Result
View All Result

REQUEST FOR EXPRESSIONS OF INTEREST  

admintj by admintj
05.06.2024
in Tenders
0
0
SHARES
86
VIEWS
Share on FacebookShare on Twitter

(CONSULTING SERVICES – FIRMS SELECTION)

Republic of Tajikistan

Technical Assistance for Financing Framework for Rogun Hydropower Project

Project Management Group under the President of the

Republic of Tajikistan (Rogun PMG)

Grant No.: E1460-TJ

Assignment Title: Update of Sedimentation Studies

Reference No. (as per Procurement Plan): RHPP/CS/CQS/4

The Republic of Tajikistan has applied for financing from the World Bank towards the cost of the Technical Assistance for Financing Framework for Rogun Hydropower Project and intends to apply part of the proceeds for consulting services.

The Projects Management Group for Energy Facilities Construction under the President of the Republic of Tajikistan now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.

The objective of the Update of Sedimentation Studies is to update and improve past evaluations of sedimentation in the Rogun Reservoir, updating potential reservoir sedimentation management techniques to extend reservoir life by taking into account the updated assessment of the effects of climate change and associated sediment yield

The Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest and may be found on the following link:

https://drive.google.com/file/d/1KA0cBWSZ_ekpQqwG1w82PSw9bpQmnUUJ/view?usp=sharing

The shortlisting criteria are:

  • 10 years of experience in 2D and 3D modelling of reservoir sedimentation, sediment transport and hydraulics. 
  • ⁠Knowledge and experience of reservoir sedimentation management techniques including density current venting and its simulation (either empirically, analytically or numerically) as evidenced by reference to project studies and/or research.

The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” July 2016 and revised in September 2023 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest.

Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.

A Consultant will be selected in accordance with the Consultants Qualification Selection Method.

Further information can be obtained via e-mail given below.

Expressions of interest must be prepared in English and submitted electronically (in PDF format) to the email addresses mentioned below by 17:00 of Dushanbe local time on June 07, 2024.

Attn: Mr. Pulod Muhiddiniyon

Director

Projects Management Group for Energy Facilities Construction

under the President of the Republic of Tajikistan

5/1 Shamsi str., 6 th floor, 734064, Dushanbe
Email : grpsgs@gmail.com

Previous Post

Engineering and Dam SafetyPanel of ExpertsforRogun Hydropower Project

Next Post

ROGUN HYDROPOWER PROJECT –UPDATED ENVIRONMENTAL ANDSOCIAL IMPACT ASSESSMENT

admintj

admintj

Next Post

ROGUN HYDROPOWER PROJECT –UPDATED ENVIRONMENTAL ANDSOCIAL IMPACT ASSESSMENT

Information of Rogun HPP

The Rogun HPP (Taj. Nerugohi barqii obii Rogun) is a hydroelectric power station under construction in Tajikistan on the Vakhsh River, which is part of the Vakhsh cascade, being its upper stage. Upon completion of the project, the dam of the Rogun HPP with a height of 335 m will become the highest in the world, and the plant will reach a capacity of 3600 MW and become the largest hydroelectric power plant in Central Asia.

Contacts

Address: 40 Sohtmonchieon str. Rogun
735417, Republic of Tajikistan
Phone: (992 3134) 22436, (992 3134) 21517;
Fax: (992 3134) 22435
E-mail: info@rogunges.tj

Contacts for international

+992 37 2410405

Social networks

  • 2023 OJC “Rogun Hydropower Plant” All rights reserved

© 2024 ҶСК "НБО Роғун"

No Result
View All Result
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
  • English
    • Тоҷикӣ
    • Русский

© 2024 ҶСК "НБО Роғун"