No Result
View All Result
  • Тоҷикӣ
  • Русский
ENGLISH BANNER
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
Rogun HPP
No Result
View All Result

REQUEST FOR EXPRESSIONS OF INTEREST

admintj by admintj
31.01.2024
in Tenders
0
0
SHARES
34
VIEWS
Share on FacebookShare on Twitter

Title:                 Selection of Project Engineer for Lot 3A and Lot 4

Closing date:      January 30, 2024

Organization:  Projects Management Group for Energy Facilities Construction under the President of the Republic of Tajikistan/ Technical Assistance for Financing Framework for Rogun Hydropower Project.  

REQUEST FOR EXPRESSIONS OF INTEREST

 Republic of Tajikistan

Technical Assistance for Financing Framework for

Rogun Hydropower Project

Consulting services: Project Engineer for Lot 3A and Lot 4

Project Background

 The Government of the Republic of Tajikistan has received financing from the World Bank in the amount of US$15,000,000 toward the cost of the Technical Assistance for Financing Framework for Rogun Hydropower Project (the TA Project).

 The TA Project will help to: (a) strengthen technical, environmental and social aspects of the Rogun hydropower plant construction project (Rogun HPP Project); (b) develop the commercial framework of the Rogun HPP Project; and (c) strengthen the institutional capacity of Rogun PMG.

 Main objectives of the assignment

  The main task to be carried out by the Project Engineer is in collaboration with the Rogun PMG to conduct the supervision of the execution of construction contracts of Lot 3A and Lot 4, undertake the detailed design review, approval of construction documents and site supervision for each of the contracts, assist the Rogun PMG during tendering/bidding process of assignments/works to be carried out under the TA Project, etc.

  The Terms of Reference for the assignment can be found at the following link:

 https://drive.google.com/file/d/1YACWRjl8qX9_VAcG8ZTI-g86GecXEANL/view?usp=sharing

  Qualification requirements:

 ·         At least Master’s Degree MSc or equivalent) in major engineering disciplines related to hydropower (civil, mechanical, or electrical and other related courses).

·         At least ten years of experience in hydropower plant design and construction, including 7 years of site experience in hydropower plant construction.

·         Experience working with World Bank funded projects with Environmental and Social safeguard provisions.

·          Fluency in Russian and English languages.  Fluency in Tajik is an added advantage.

  The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” July 2016 and revised in September 2023 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest.

 Interested consultants may obtain further information at the address below during office hours 09:00 to 17:00 (local time).

 Interested specialists must submit CV, two Recommendation letters and a cover letter in Tajik/Russian and English languages with indication of the position name to the address below (in person or by e-mail) by January 30, 2024 (17:00 Dushanbe time)

 Attn: Mr. Pulod Muhiddiniyon

Director

Projects Management Group for Energy Facilities Construction

under the President of the Republic of Tajikistan

5/1 Shamsi str., 6 th floor, 734064, Dushanbe Tel.:(+992 37) 235 74 17

E-mail: grpsgs@mail.ru   

Previous Post

Organization:  Projects Management Group for Energy Facilities Construction under the President of the Republic of Tajikistan/ Technical Assistance for Financing Framework for Rogun Hydropower Project.

Next Post

REQUEST FOR EXPRESSIONS OF INTEREST

admintj

admintj

Next Post

REQUEST FOR EXPRESSIONS OF INTEREST

Information of Rogun HPP

The Rogun HPP (Taj. Nerugohi barqii obii Rogun) is a hydroelectric power station under construction in Tajikistan on the Vakhsh River, which is part of the Vakhsh cascade, being its upper stage. Upon completion of the project, the dam of the Rogun HPP with a height of 335 m will become the highest in the world, and the plant will reach a capacity of 3600 MW and become the largest hydroelectric power plant in Central Asia.

Contacts

Address: 40 Sohtmonchieon str. Rogun
735417, Republic of Tajikistan
Phone: (992 3134) 22436, (992 3134) 21517;
Fax: (992 3134) 22435
E-mail: info@rogunges.tj

Contacts for international

+992 37 2410405

Social networks

  • 2023 OJC “Rogun Hydropower Plant” All rights reserved

© 2024 ҶСК "НБО Роғун"

No Result
View All Result
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
  • English
    • Тоҷикӣ
    • Русский

© 2024 ҶСК "НБО Роғун"