No Result
View All Result
  • Тоҷикӣ
  • Русский
ENGLISH BANNER
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
Rogun HPP
No Result
View All Result

Invitation to participate in the tender

admintj by admintj
22.05.2023
in Tenders
0
0
SHARES
12
VIEWS
Share on FacebookShare on Twitter

REQUEST FOR EXPRESSIONS OF INTEREST (EXTENSION)

 

Republic of Tajikistan

Project Management Group

under the President of the Republic of Tajikistan (Rogun PMG)

Assignment Title: Hydraulics Expert

Reference No. (as per Procurement Plan): RHPP/CS/IC/02

The Republic of Tajikistan has applied for financing from the World Bank towards the cost of the Technical Assistance for Financing Framework for Rogun Hydropower Project and intends to apply part of the proceeds for consulting services of Hydraulics Expert.

The main task carried out by Hydraulics Expert is to review of the overall flood management provisions foreseen for the project., check conformance of the design of the hydraulic structures with international best practice, review of the layout and design of hydraulics structures, including the right bank tunnels and surface spillways, review the layout and design of the energy dissipation devices, identify possible optimizations., review of scouring assessment of the plunge pools in line with the latest analytical technique, etc.

The Terms of Reference for the assignment can be found at the following link:  

https://drive.google.com/file/d/1kXI09pm-3WpcX4pFneENDk2uxKBmnBhn/view?usp=sharing

Qualification requirements:

 Master’s Degree in Civil Engineering and/or Hydraulics.

  • Fluent in English (speaking and writing).
  • 25 years overall professional experience.
  • 20 years on hydropower projects.
  • 10 years direct participation in design of hydraulic structures.
  • At least one previous experience as a POE member on a large hydropower project.
  • At least two projects with spillway capacity of at least 2000 m3/s.
  • At least two projects with a spillway having a total head (H) of at least 200 meters

The Projects Management Group for Energy Facilities Construction under the President of the Republic of Tajikistan now invites eligible individual consultants to express their interest in providing the services. Interested Consultants must provide information indicating that they are qualified to perform the services (CV, copy of documents evidencing appropriate qualifications and skills, experience and competence related to the task, description of similar tasks performed, references, etc.).

The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” July 2016 and revised November 2017, August 2018, and November 2020 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest.

A Consultant will be selected in accordance with the selection of Individual Consultants (IC) method set out in the Consultant Guidelines.

Interested Consultants may obtain further information at the address below during office hours 09:00 to 17:00 hours of Dushanbe/Tajikistan time.

CVs must be delivered to the address below by June 3, 2022 (17:00 p.m.).

Attn: Mr. Pulod Muhiddiniyon

Director

Projects Management Group for Energy Facilities Construction

under the President of the Republic of Tajikistan

5/1 Shamsi str., 6 th floor, 734064, Dushanbe
Tel.:(+992 37) 235 74 17
E-mail: grpsgs@mail.ru grpsgs@gmail.com   

Previous Post

Invitation to participate in the tender

Next Post

Invitation to participate in the tender

admintj

admintj

Next Post

Invitation to participate in the tender

Information of Rogun HPP

The Rogun HPP (Taj. Nerugohi barqii obii Rogun) is a hydroelectric power station under construction in Tajikistan on the Vakhsh River, which is part of the Vakhsh cascade, being its upper stage. Upon completion of the project, the dam of the Rogun HPP with a height of 335 m will become the highest in the world, and the plant will reach a capacity of 3600 MW and become the largest hydroelectric power plant in Central Asia.

Contacts

Address: 40 Sohtmonchieon str. Rogun
735417, Republic of Tajikistan
Phone: (992 3134) 22436, (992 3134) 21517;
Fax: (992 3134) 22435
E-mail: info@rogunges.tj

Contacts for international

+992 37 2410405

Social networks

  • 2023 OJC “Rogun Hydropower Plant” All rights reserved

© 2024 ҶСК "НБО Роғун"

No Result
View All Result
  • HOME
    • TENDERS
    • NEWS
    • Report
    • HISTORY
  • REPORTS OF THE WORLD BANK
  • FINANCIAL RELATIONS
  • Photos
    • Videos
  • INFORMATION CENTER
  • JOB
  • English
    • Тоҷикӣ
    • Русский

© 2024 ҶСК "НБО Роғун"